Work is progressing well on the garden. Around 18 volunteers from the Green Gym removed or cut back some of the existing shrubs, a new path was dug out and all the slabs were lifted in preparation for them being relaid at a different angle. Here are some photos of how the garden looks at this stage.
This area will include slabs, a raised bed and seating, with the sensory rainbow walk at the far end.
This will be the storytelling area.

Here's the Green Gym hard at work!
